2020 Hot Sale New Designed CLC Block Making Machine

FOB Reference Price:Get Latest Price
$8,500.00 - $10,000.00 / Set | 1 Set/Sets (Min. Order)
Model Number:
100A-102D
Power:
6 -11.5 KW
Shipping:
Support Sea freight
Lead Time:
Quantity(Sets) 1 - 1 >1
Est. Time(days) 12 Negotiable
Contact Supplier
Report Suspicious Activity
Overview
Quick Details
Warranty:
1 year
Brick Raw Material:
Concrete
Capacity:
5.3-10M3/Hour
Type:
CLC Block Machine
Certification:
ISO
Applicable Industries:
Construction works 
After Warranty Service:
Video technical support
Local Service Location:
India
Showroom Location:
India
Condition:
New
Processing:
Brick Molding Machine
Method:
CLC Block Making Machine
Automatic:
Yes
Place of Origin:
Henan, China
Brand Name:
HT
Voltage:
380V 50HZ 3Phase(Customized)
Dimension(L*W*H):
3400x1060x2000 Mm
After-sales Service Provided:
Online support, Video technical support, Engineers available to service machinery overseas
Key Selling Points:
Automatic
Particle Size:
≤1.5 CM
Max Pressure:
2.0 Mpa
Outlet Pressure:
1.6 Mpa
Supply Ability
Supply Ability:
100 Set/Sets per Month
Packaging & Delivery
Packaging Details
Standard Export Wooden Case
Port
Qingdao
Lead Time :
Quantity(Sets) 1 - 1 >1
Est. Time(days) 12 To be negotiated

CLC Block Making Machine :

Product Description

 

1 Application And Features :

 

Concrete foaming heat insulation plate production line, through many years’ experience in the production of foam

 

concrete, refers to large foam concrete board production line configuration, optimize formulations, with advanced equipment, develop a new generation of foam concrete slab production line.

 

Reliable technology, small investment, construction period is short, can get rapid gains;

 

The main raw materials: cement, foaming agents, which is common and easy to get;

 

Production way is flexible, easy to implement; social and economic benefits are very significant.


1.1 Simple structure, convenient operation, small footprint, easy transition.

 

1.2 Mixer automatic feeding, reduce the work of workers; direction control system can effectively control of the direction of mixer; slurry discharge system can effectively solute congestion of discharge.

 

1.3 Mixing system with precise measurement,can mix the slurry evenly,does not harm the bulbs,can finish stirring a pot of feed with 2 to 3 minutes, high production efficiency.

 

1.4 Cutting unit equips with advanced power control systems, inverter controls the speed of material feeding, effectively control the yield and quality, easy to operate. Cutting system uses a reciprocating motion system, high cutting accuracy and quick speed.

 

1.5 Mold uses sub-structure, precise size, easy disassembly.

 

Concrete Blocks Molds : 

One Entire Production Line ( 7-8m³Per Hour )

Item

Name

Amount

1

Mixing Machine

1 set

2

Air Compressor

1 set

3

Foaming Agent

1 T

4

Mould (1230x930x330 mm)

50 pieces

5

Cutting Machine

1 set

6

Packaging Machine

1 set

 

 

Mixer :

 

 

 

Mould :

 

 

 

Foaming Concrete Injection From Mixer To Mould :

 

 

Cutter :

 

 

Cutter :

 

 

Packaging Machine :

 

 

Finished Product :

 

 

Foaming Agent :

 

 

Moulds :

 

 


 

 

 

 

2 Production Process :

 

2.1 Mix cement: 
Mix different grades cement(dry mixing)

 

2.2 Feeding: 
Through feeding system to feed quantitative composite cement, foaming agent and water to the foam concrete mixing and foaming equipment.

 

2.3 Mixing And Foaming: 
The material in the mixing and foaming equipment can be foamed after 4 minutes’ mixing, foaming time is about 2-3 minutes;

 

2.4 Injection Molding: 
Inject the stirred and foamed slurry into the mold (each box filled with a molding material, around 0.6 M2)

 

2.5 Initial Conservation: 
After the step of injection molding, stands three hours

 

2.6 Mold Unloading: 
After three hours, pending the initial concreting of foam concrete is finished and has initial strength, then you can release the mold.

 

2.7 Interim Conservation: 
Suitable temperature:25 ℃ ± 10 ℃
maintain three days, sprinkle water to cover film,you need to erect the greenhouse if the temperature can not achieve requirement.

 

2.8 Cutting: 
One week after mold unloading(including mid-term conservation of three days),it can be cut according to the specifications required(adjust the blade of cutting equipment)

 

2.9 Finished Product Conservation: 
Foam concrete slab conservation period is 7 days, if the delivery time is shorter, can be packed and delivered after cutting.

 

 

 

Related Products

1 Concrete Foaming Pumping Machine

 

2 Foaming Agent

 

 

FAQ

 

1 How about the quality of machines?
   Our machines adopt advanced technology. Moreover, we carry out strict supervision during production and make    sure every finished product with high quality.
2 About the delivery time.
   Generally, it will be about 20-25 days days after your deposit, which also will be on basis of your order.
3 About warranty.
   We provide 12 months for warranty.
4 Which kind of payment is available for us?
    T/T, L/C and  Western Union are common for us.
5 How about the service?
   Provide overseas installation, debugging and training the relating work .

 

 

Packaging & Shipping

 

 Shipped in one 20ft container

 

 

Our Services

 

High quality with low price :
Focus on water filter area,our factory has more than 20 years of professional experience,the price is directly from factory to our clients.

 

Multiple delivery choice :
We have big discount with forwarder,keep the goods reach yourside fast and safety.

 

Customer First, Credit-based :
7 x 24 hours service,every equiry will be treated carefully by us with authentic and quick replying.

 

 

 

Company Information